Bridle Trails residents will participate in Neighborhood Enhancement Program next in 2025, from January to September. A total of $445,000 has been allocated for NEP projects selected by residents of the Bridle Trails neighborhood area in 2025.
In the last NEP cycle, Bridle Trails residents selected three capital improvement projects in 2018: construction of a sidewalk along a section of Northeast 40th Street; safety improvements to the intersection by Cherry Crest Elementary School and an array of improvements to Cherry Crest Mini Park.
This project will construct a sidewalk with planter strip on the north side of Northeast 40th Street from 140th Avenue Northeast to approximately the 14500 block, filling in a missing gap. In conjunction with the sidewalk project, bike lanes will also be added along the NE 40th Street corridor. Other elements to be included in this project are a marked pedestrian crossing near 142nd Avenue and storm drainage improvements. This project is made possible with NEP funds for which the neighborhood voted in 2018, along with funds from the Transportation Departments’s Neighborhood Sidewalk Program and the Neighborhood Safety and Connectivity levy.
Estimated Project Completion: spring/summer 2024 (NEP funding $75,750 + Transportation department budgets $1.65 million + Bike Levy $60,000)
Chris Schniegenberg is a top rated bellevue bridle trails real estate agent
Project manager: Glen Kho (425-452-4586 or [email protected])
This project enhanced the three-leg intersection at 124th Avenue Northeast and Northeast 32nd Street to encourage stop compliance and a safer pedestrian crossing condition. The project included installation of a streetlight on the southwest corner of 124th Avenue and Northeast 32nd Street, replacement of existing stop signs with flashing ones and added crayon-themed crosswalk paint in the north-south crosswalk.
Project Completed: summer 2020
Project Manager: Jeremy Chin (425-452-4179 or [email protected])
This project will provide for various park improvements including: General Improvements: Power washing of entire park site, refinish trellis at entry, repaint handrails and concrete wall letter blocks at picnic area, install a bike rack. Playground Area Improvements: Relocation and replacement of water fountain (and addition of pet fountain), replacement of play equipment and digger, replacement of poured-in-place surface at play area, removal of concrete letter blocks at play area and extend knee wall. Court Areas: Power wash courts, replace the basketball backboards and restripe court, replace the tennis court windscreen, restripe the tennis court and add striping for pickleball, refinish tennis court benches.
Chris Schniegenberg is one of the top real estate agents in King county, Bellevue, Snohomish, Pierce counties
If you have questions about affordability, credit, legal matters, or income, trust Chris to find you what you need fast. Chris will make sure you feel confident and educated every step of the way.